7steps between your order and the glass going in

Made to measure glass is not picked off a shelf, it is made. Here is what happens after you order, in the order it happens, what we need from you at each step, and the exact point after which nothing about the panel can change.

19/08/2026 · 4 min read

Ordering cut to size glass is not like ordering a boxed product. Your panel does not exist when you order it. Knowing the sequence is useful for two reasons: you know what is happening while you wait, and you know which moment is the last one where the panel can still be changed at all.

1. The measurements

Everything starts here, because everything downstream is cut to these numbers. Either you measure, using a tape and our printable measuring pack, or you book a measure visit and somebody else takes responsibility for the sizes. If the opening is out of square, structural, or you are simply not sure, the visit is the safer of the two options. See the ten measuring mistakes before you pick up a tape.

2. The quote

A quote lists each pane with its glass type, thickness, size, edge finish and every feature on it, so you can check the specification rather than just the total. It shows the VAT position and the lead time, which is production time plus delivery time rather than one blended figure. A quote is open until the expiry date printed on it, and after that the rates behind it may have moved.

3. The order, and the drawing you approve

This is the important one. For bespoke panels we send you a drawing, and production does not start until you approve it. The drawing is your last chance to catch a wrong size, a cut-out on the wrong side, a hinge on the wrong edge or a door hung the wrong way round. Everything on it can still be changed at this moment and cannot be changed two steps later, so read it against your own sketch rather than skimming it. You approve it from your order tracking page.

4. Cutting and processing

The panel is cut from stock, then the edges are worked to the finish you chose, then holes, notches and cut-outs are machined. The sequence matters: everything mechanical happens now, while the glass is still ordinary annealed glass that can be cut and drilled.

5. Toughening, and the point of no return

The panel goes through the furnace, and that is the end of the machining. Nothing can be cut, drilled or trimmed after toughening, so if a dimension is wrong the answer is a new panel, not an adjustment. Toughened glass also comes out with slight optical distortion, visible in reflection at an angle on a big pane. That is normal, and it is a consequence of the process that makes it safe.

6. Checks, then delivery or collection

Each pane is checked against its cutting ticket before it leaves the building. From there it is either collected from the counter, which you will be told is ready, or delivered on our own route at the rate for your postcode. Two practical points for delivery day: large or heavy panes need more than one pair of hands, and the driver takes a signature on the delivery note, so somebody has to be there. Check the glass before you sign, and photograph anything that is not right straight away rather than after the fitter has left. The delivery terms set out what to do and how long you have.

7. Fitting day

What a fitter needs is clear access, a finished wall or tray to fit against, and the panel undamaged and the right way up. If we are fitting, that is a service line on your order rather than a percentage of the glass price. If your own fitter is doing it, hand them the drawing. And when silicone is involved, look at what the sealant maker states on the tube for curing before the shower gets used, because a joint that is used too early is a joint that fails.

Where to see the stage your job is at

Every order moves through the same states, and you can see yours on the tracking page at any time: received, cutting and processing, ready, then despatched or ready to collect, and finally delivered or collected. If a drawing is waiting for you, it is on that page too. Go to track your order with your order reference.

What can still change, and when

  • Before you approve the drawing: sizes, cut-outs, edges, hinge positions, glass type, everything.
  • After approval, before toughening: ask immediately, because the panel may already be cut.
  • After toughening: nothing. A change means a new panel.

Which is exactly why the drawing is worth five careful minutes.

Keep reading

Related guides

19/08/2026

10mistakes people make measuring an alcove

An alcove is never as square as it looks. These are the ten things that most often turn a confident measurement into a panel that will not go in, and the check that catches each one while it is still a pencil line rather than cut glass.

19/08/2026

8things that change what a glass splashback costs

There is no single price for a splashback, because a splashback is made to one wall. These are the eight things that move the number, roughly in the order they move it, and where to see our live rate for the panel you actually want.

19/08/2026

9jobs, and whether toughened or laminated is the right glass

Both are safety glass, and they fail in completely different ways. Toughened turns into blunt granules, laminated holds together on its interlayer. Here is what that difference means job by job, from a shower screen to a rooflight.